Kirkland Lake Gold has chosen MICROMINE's Pitram software for its Fosterville operation in Australia
06 March 2019
GR Engineering Services has been awarded a contract by Kirkland Lake Gold's Fosterville gold mine
31 August 2018
Veolia Water Technologies will design and supply a reverse osmosis plant for the Fosterville mine
20 April 2018
Kirkland Lake Gold will sink the shaft in two phases
26 January 2018
Clean TeQ Water will design a mine water treatment plant for Fosterville
15 December 2017
Carly Leonida looks at the tantalising prospects of electric load and haul fleets
24 May 2017
WSP speaks with Mining Journal, Mining Magazine and Australia's Mining Monthly
Mining Journal, Mining Magazine and Australia’s Mining Monthly speaks with Weir.
Weir has developed a range of transformational flowsheets for tailings management
The ESG Mining Company Index report provides an in-depth evaluation of ESG performance of 61 of the world's largest mining companies. Using a robust framework, it assesses each company across 9 meticulously weighted indicators within 6 essential pillars.
A comprehensive review of exploration trends and technologies, highlighting the best intercepts and discoveries and the latest initial resource estimates.
The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets
An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production