PROCESSING

Petropavlovsk production falls on concentrate supply

Reduced output primarily due to lower processing volumes at the company's Pressure Oxidation plant

The new flotation plant will double the group’s flotation capacity to 7.2Mtpa

The new flotation plant will double the group’s flotation capacity to 7.2Mtpa

Petropavlovsk said reduced output of 95.6koz was primarily due to lower processing volumes and grades of third-party concentrates at the company's Pressure Oxidation (POX) Hub facility. The company uses the 500kt/yr POX plant in Pokrovskiy to process its own and third-party gold ore.

Production using the company's own ore fell 19% to 82.4koz in the first quarter, with marginally higher Malomir production offset by reduced output at the Albyn and Pioneer mines.

However, production of gold from third-party concentrate saw the biggest fall, to 13.2koz from 84.2koz, due to lower volumes of concentrate available for purchase and lower grades in the concentrates supplied.

The POX Hub can process previously untreatable refractory ores, where gold is locked in sulphides, said the company on its website.

The POX method begins with the same processes as a traditional Resin-in-pulp method where ore is mined, crushed and ground.  It then passes through a flotation circuit which produces a high-grade concentrate equating to between 2.8% and 4.2% of the original mass of the ore.  Concentrate is then transported to the POX Hub for further processing and gold recovery.

Petropavlovsk said it plans to commission a flotation plant at its Pioneer mine in the second quarter.

Once operational, the new Pioneer flotation plant will double the company's processing capacity from its own mines to 7.2Mtpa, "This will reduce the POX Hub's reliance on treating low-margin 3rd-party concentrates," said Petropavlovsk.

In the first quarter, Pioneer processed non-refractory ore from both open pit and underground mining operations to produce 24.1koz from ore with an average grade of 0.67g/t and recoveries of c.81%, in line with expectations.

The lower grade of ore processed relative to mined grades reflects the impact of stockpiling higher grade refractory gold ores ahead of the start-up of the new flotation plant

A third line is also under construction at the Malomir flotation plant is underway which will add 1.8Mtpa of flotation capacity from Q3 2022, bringing the total combined group capacity up to 9 Mtpa.

The company expects totalgold production this year of 430-470koz, comprising own gold production of 370-390koz and gold production from 3rd-party concentrate of 60 - 80koz.

A growing series of reports, each focused on a key discussion point for the mining sector, brought to you by the Mining Magazine Intelligence team.

A growing series of reports, each focused on a key discussion point for the mining sector, brought to you by the Mining Magazine Intelligence team.

editions

Mining Magazine Intelligence: Automation and Digitalisation Report 2024

Exclusive research for Mining Magazine Intelligence Automation and Digitalisation Report 2024 shows mining companies are embracing cutting-edge tech

editions

ESG Mining Company Index: Benchmarking the Future of Sustainable Mining

The ESG Mining Company Index report provides an in-depth evaluation of ESG performance of 61 of the world's largest mining companies. Using a robust framework, it assesses each company across 9 meticulously weighted indicators within 6 essential pillars.

editions

Mining Magazine Intelligence Exploration Report 2024 (feat. Opaxe data)

A comprehensive review of exploration trends and technologies, highlighting the best intercepts and discoveries and the latest initial resource estimates.

editions

Mining Magazine Intelligence Future Fleets Report 2024

The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets