SURFACE

ScoZinc PFS sees production starting 9-12 months after financing

Production at ScoZinc's Scotia lead-zinc-gypsum mine can begin nine to 12 months after financing.

The Scotia mine can be producing within a year.

The Scotia mine can be producing within a year.

Production at ScoZinc's Scotia lead-zinc-gypsum mine can begin nine to 12 months after financing, according to its latest Pre-Feasibility Study.

The mine has been on care and maintenance since 2009, and requires little upgrade to operate efficiently, with initial capital expenditure estimated at approximately C$30.6 million.

The PFS projects an after-tax net present value of C$128 million at an 8% discount rate, with an after-tax internal rate of return of 65%. The payback period is 1.3 years, and estimated cumulative cash flow will be C$55 million for the first three years.

The mine is open-pit, with drilling and blasting required for 40% of the mining concessions.

The mine will have a life of 14.3 years, producing an average of 35 million pounds of zinc and 15 million pounds of lead in the first five years, with a processing throughput rain of 2,700 tonnes per day. The plant will process approximately 1 million tonnes per annum.

The concentrator plant was last in operation in 2009, at 2,200 tpd. Few upgrades are required to the comminution, flotation, and dewatering circuits to bring production levels to 2,700 tpd, the PFS found.

Most of the mine infrastructure is in place, with ScoZinc planning to spend C$5.3 million for equipment and spare parts.

The tailings storage facility is currently permitted for 8 million tonnes capacity. ScoZinc plans to expand capacity by 6 million tonnes, or use in-pit tailings deposal, at year six.

Half of the mineral resources are already permitted, and these activities can begin once financing is secured.

The Scotia Mine contains measured resources of 4.3 million tonnes grading 2.57% zinc, 1.32% lead, 3.83% zinc equivalent, and gypsum tonnage of 1.5 million tonnes grading 92.8%. Indicated resources are 21.1 million tonnes at 1.75% zinc, 0.92% lead, 2.64% zinc equivalent, with gypsum tonnage at 3.7 million tonnes grading 91.4% gypsum.

A growing series of reports, each focused on a key discussion point for the mining sector, brought to you by the Mining Magazine Intelligence team.

A growing series of reports, each focused on a key discussion point for the mining sector, brought to you by the Mining Magazine Intelligence team.

editions

Mining Magazine Intelligence Exploration Report 2024 (feat. Opaxe data)

A comprehensive review of exploration trends and technologies, highlighting the best intercepts and discoveries and the latest initial resource estimates.

editions

Mining Magazine Intelligence Future Fleets Report 2024

The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets

editions

Mining Magazine Intelligence Digitalisation Report 2023

An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production

editions

Mining Magazine Intelligence Automation Report 2023

An in-depth review of operations using autonomous solutions in every region and sector, including analysis of the factors driving investment decisions