Software release offers greater capabilities, including advanced scheduling
05 March 2021
Minemax Haulage will be released as a part of the newly redesigned Tempo
16 January 2019
Tempo version 3.0.4 with an enhanced BZ-based scheduling engine is now available through the MSM
10 September 2018
Minemax has released a new version of iGantt for activity-based production scheduling
09 July 2018
Minemax Scheduler 6.4.2 with fixed cost modelling is now available to all maintained users
05 April 2018
Minemax has released the all-new Tempo open-pit mine planning solution
19 September 2017
iGantt 5.2 is the latest version of Minemax's interactive Gantt chart production scheduling software
25 May 2017
Minemax Scheduler 6.3 will soon feature the ability to model leach lag
17 January 2017
WSP speaks with Mining Journal, Mining Magazine and Australia's Mining Monthly
Mining Journal, Mining Magazine and Australia’s Mining Monthly speaks with Weir.
Weir has developed a range of transformational flowsheets for tailings management
A comprehensive review of exploration trends and technologies, highlighting the best intercepts and discoveries and the latest initial resource estimates.
The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets
An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production
An in-depth review of operations using autonomous solutions in every region and sector, including analysis of the factors driving investment decisions