The dual-purpose ventilation shaft extends to a depth of 950 meters
20 June 2023
Ivanhoe aims to accelerate production from the phase two expansion at Platreef
13 March 2023
Kamoa-Kakula medical team in place to identify and treat potential COVID-19 cases
06 April 2020
Ivanhoe Mines fast-tracks feasibility study on a smaller-scale, early-stage development plan
15 January 2020
The Ivanplats shaft-sinking team has reached the top of the high-grade Flatreef deposit
08 October 2018
Ivanplats has signed a long-term deal for the supply of treated bulk water for the Platreef mine
08 May 2018
The Platreef PGE-nickel-copper project in South Africa will build a station at this level of Shaft 1
25 April 2018
Permanent sinking work has begun on Shaft 1 at Ivanhoe Mines' Platreef mine in South Africa
15 July 2016
WSP speaks with Mining Journal, Mining Magazine and Australia's Mining Monthly
Mining Journal, Mining Magazine and Australia’s Mining Monthly speaks with Weir.
Weir has developed a range of transformational flowsheets for tailings management
A comprehensive review of exploration trends and technologies, highlighting the best intercepts and discoveries and the latest initial resource estimates.
The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets
An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production
An in-depth review of operations using autonomous solutions in every region and sector, including analysis of the factors driving investment decisions