TECHNOLOGY

Metso invests in faster assembly line

Metso has commissioned a new, faster assembly line at its factory in Tampere, Finland

Staff reporter
Operating in two shifts, the new assembly line can complete more than two track-mounted crushing plants in one day

Operating in two shifts, the new assembly line can complete more than two track-mounted crushing plants in one day

PRESS RELEASE: The assembly of a 50t, track-mounted crushing plant now takes two working days. The serial production line operates in two shifts and increases Metso's mobile crushing plant production capacity by 25%.

Markku Simula, president, aggregates equipment business area at Metso, said: “Demand for mobile Lokotrack crushers for aggregates took an upward turn 18 months ago, so the timing of our investment in capacity growth was right. We want to ensure that our production capacity can meet customers' growing needs. Quality of Metso engineering has an excellent reputation around the world. This has helped Tampere become a global technology hub for Metso's track-mounted crushers.”

The new high-speed assembly line has six assembly stations instead of the previous five, thus improving the line's flexibility and shortening the overall assembly time. Currently, the line is used for assembling the most popular crusher models. Assembly of also heavier and more complex models will begin in spring.

/

The first Lokotrack model rolled off the new assembly line in the second week of January. The start-up has proceeded as planned. Based on the current plan, the assembly line will complete about 200 crushing plants before summer.

Juha Erkkilä, project manager at Metso, explained: “Continuous production development is part of our operating method. This investment shortens the delivery times of our most popular models and further improves occupational safety. The new assembly line has also enabled us to reorganise production and implement new operating methods.”

Aggregate crushing plants have been built in Tampere for 98 years: the first jaw crusher was completed at the Lokomo workshop back in 1921. In 1985, Tampere was the first location in the world to begin the assembly of track-mounted crushing plants.

Over the past three decades, more than 7,000 Lokotrack crushing plants have been manufactured in Tampere. The manufacturing operations have also expanded to India and China.

The Internet of Things and new environmental requirements are reflected in the product development. Today, the operations of a Lokotrack crusher can be remotely monitored from any location via a satellite connection. Noise protection and reduced dust emissions minimise the environmental impacts, making it possible to operate crushers even in dense urban areas.

A growing series of reports, each focused on a key discussion point for the mining sector, brought to you by the Mining Magazine Intelligence team.

A growing series of reports, each focused on a key discussion point for the mining sector, brought to you by the Mining Magazine Intelligence team.

editions

ESG Mining Company Index: Benchmarking the Future of Sustainable Mining

The ESG Mining Company Index report provides an in-depth evaluation of ESG performance of 61 of the world's largest mining companies. Using a robust framework, it assesses each company across 9 meticulously weighted indicators within 6 essential pillars.

editions

Mining Magazine Intelligence Exploration Report 2024 (feat. Opaxe data)

A comprehensive review of exploration trends and technologies, highlighting the best intercepts and discoveries and the latest initial resource estimates.

editions

Mining Magazine Intelligence Future Fleets Report 2024

The report paints a picture of the equipment landscape and includes detailed profiles of mines that are employing these fleets

editions

Mining Magazine Intelligence Digitalisation Report 2023

An in-depth review of operations that use digitalisation technology to drive improvements across all areas of mining production